Tender No. |
Description |
Remark |
01 |
Job work for Cleaning and Finishing of the Boiler Tubes & etc. |
|
02 |
Job work for the Dismantling of Old Vapour Pipe Line & New Supply, Erection & to Give Testing of Erected Vapour Line. |
|
03 |
Overhauling & Re-commissioning of Turbines. |
|
04 |
Overhauling of F.M.G. make Gear Box/Planetary Gear Box. |
|
05 |
Overhauling & Servicing of Air Compressors & Rotary Air Blower. |
|
06 |
Job work for Oil Filtration. |
|
07 |
Job work for Overhauling & Re-commissioning of Bharat Bijlee make D.C. Drives. |
|
08 |
Job work for De-shelling & Re-shelling of Mill Rollers. |
|
09 |
Job work for Overhauling & Stamping of Weigh Bridges. |
|
10 |
Job work for Removing & Refitting of S.S./Brass/ERW Tubes on labour basis. |
|
11 |
Job work for Overhauling & Re-commissioning of KEC make D.C. Drives & A.C. Drives. |
|
12 |
Job work for Vibration Measurement, Diagnosis, Analysis & Site Balancing. |
|
13 |
Job work for Testing & Refilling of Mill Hyd. Accumulators, Overhauling of Mill Hyd. Panel & Pump with required spares. |
|
14 |
Job Work for Case Hardening of Mill Roller Shaft Journal/Master Gear Shaft Journal. |
|
15 |
Overhauling of 2.5 MW Brushless Alternator, AVRs, Protection Relays & Air Circuit Breaker. |
|
16 |
Job Work for Overhauling of Lubin make Centralized Lubrication System. |
|
17 |
Job Work for Repairing of Boilers. |
|
18 |
Job Work for Thermal Insulation (Lagging) and Aluminum Cladding. |
|
19 |
Job Work for Overhauling of Acqua Tech make D.M. Plant. |
|
20 |
Job work for the Replacement of Tubes of Air Cooler of Air Compressor. |
|
21 |
Overhauling & Repairing of Y.U. Tech. make Auto Cane Feeding Device. |
|
22 |
AMC for Overhauling, Servicing & Re-commissioning of Automation/ Instrumentation systems. |
|
23 |
Job work for Vibratory Stress Reliving. |
|
24 |
Dismantling of old Multi-Jet Condenser and to Supply, Erec. & Comm. of New S.S. Single entry Condenser with S.S. Tail Pipe for Pan. |
|
25 |
Overhauling & Servicing of L & T make A.C.B. |
|
26 |
Overhauling & Servicing of Pan Discharge Valve Hydraulic System. |
|
27 |
Job Work for Repairing/Reconditioning of old Various types & Sizes of Valves. |
|
28 |
Annual Rate Contract for the L & T make Special Welding Electrodes & Hard facing Powder. |
|
29 |
Rate Contract for Supply of Mangalam make Welding Rod. |
|
30 |
Rate Contract for Supply of Oxygen Gas & Acetylene Gas Cylinder. |
|
31 |
Rate Contract for Supply of Bharat Metal Cutting Gas Cylinders. |
|
32 |
Rate Contract for G.M./C.I. Bushes/Rods/Bars etc. on Labour basis. |
|
33 |
Electrical Materials. |
|
34 |
PVC Insulated Copper/ Aluminum Cable & Potentiometer. |
|
35 |
L & T and Siemens make Electrical Materials. |
|
36 |
Adjustable Speed Controller, Power Capacitor, Thruster, Ammeters, Voltmeters & etc. |
|
37 |
Carbon Brushes. |
|
38 |
LED Indicator, Spares for 2.5 MW Alternator Panel & Bharat Bijlee make D.C. Drives. |
|
39 |
Brass Working/S.S. Screens & Zigzag Rods. |
|
40 |
Jointing & Packing. |
|
41 |
C.S. Trash Plates, Scraper Plates & G.M. Bearing Liner. |
|
42 |
Shalimar/Berger make Paints & Brushes. (ENGG). |
|
43 |
Complete Gear Box & Spare Input Shaft. |
|
44 |
Spares for Boiler Drain & Soot Blower Piping. |
|
45 |
Wheel Bearing Grease & Molysulf 400 Grease. |
|
46 |
Boiler Refractory Material. |
|
47 |
Spares for Dumping Grate Furnace of WIL make Boiler. |
|
48 |
Transmission Chain for Bagasse Carrier Spares. |
|
49 |
TI Diamond make Duplex/Simplex Chain & Chain Spares. |
|
50 |
Imco make Carbide Tips, Cane Leveler Knives & CSDE Knives. |
|
51 |
M.S. Fabricated Rakes & Spare Roller. |
|
52 |
NU-Tech make Gear Coupling. |
|
53 |
Wire Rope, Nylon Rope, Nylon Rope Pulleys & etc. |
|
54 |
C.I.D.F Pipes. |
|
55 |
Various types of Workshop Tools. |
|
56 |
M.S. Pipes & Pipe Fitting Materials. |
|
57 |
S.S. Pipes, Short Bends, Plates, Tubes, & Flanges. |
|
58 |
Iron & Steels. |
|
59 |
H.T./Allenkey/M.S./S.S. Nut Bolts, Nylock Nut, G.I. Nut , Split Pins & etc. |
|
60 |
G.M./C.I./S.S./NR Valves & etc. |
|
61 |
Spares for Turbines. |
|
62 |
KSB make Spares for KSB make Boiler Feed Pumps. |
|
63 |
PSP make Complete Magma Pump & Spares for Gita make Magma Pump. |
|
64 |
IBR CS Steam Valve, Gate Valve & NR Valves. |
|
65 |
Lovejoy make C.I. Couplings, Rubber Stars & etc. |
|
66 |
Spares for NHEC/WIL make Centrifugal Machine. |
|
67 |
Spares for Thyssen krupp make Batch Type C/F Machine. |
|
68 |
Rubber Oil Seals. |
|
69 |
Syno make Spares for Syno make Pump. |
|
70 |
Spares for Air Compressor & Supply of Air Cooler. |
|